Here we have filled the interior footings with concrete for a heated floor.
|
Before we can start laying bricks, we have to get as many bricks in the house as we can before the walls start getting in the way. |
This bond beam in the garage really is the last one, it better be since everyone is ready for the barn.
|
Building of the fireplace in master bedroom on a two bedroom unit. |